无码中文字幕va精品影院,国产久热香蕉在线观看,久久福利青草狠狠午夜,亚洲国产精品嫩草影院,小雪游泳池被教练猛烈进出,亚洲天堂网2018官网

銷售咨詢熱線
15953126901
18615254757
常見問題 question
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
  • 手機(jī):15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟(jì)南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
當(dāng)前位置: 首頁 > 新聞資訊>常見問題輕型鋼結(jié)構(gòu)常見的質(zhì)量問題及影響因素

輕型鋼結(jié)構(gòu)常見的質(zhì)量問題及影響因素

來源:http://nsjsw.cn 日期:2023-12-23 發(fā)布人: 瀏覽次數(shù):1

輕鋼結(jié)構(gòu)工程中常見的質(zhì)量事故

Common quality accidents in light steel structure engineering

一、電網(wǎng)工程常見質(zhì)量事故

1、 Common quality accidents in power grid engineering

(1)鋼筋彎曲變形或局部斷裂

(1) Bending deformation or local fracture of steel bars

(2)鋼筋密封板或錐頭焊縫損壞

(2) Damaged reinforcement sealing plate or cone head weld seam

(3)關(guān)節(jié)變形或斷裂

(3) Joint deformation or fracture

(4)焊縫不飽滿或有超過規(guī)定標(biāo)準(zhǔn)的氣泡、夾渣和微裂紋

(4) The weld seam is not full or has bubbles, slag inclusions, and microcracks that exceed the specified standards

(5)高強(qiáng)度螺栓斷裂或從球節(jié)中拔出

(5) High strength bolt fracture or extraction from ball joint

20201126055137960.jpg

(6)構(gòu)件在節(jié)點(diǎn)處碰撞,支撐上弦桿支撐時(shí)支撐腹桿與支撐結(jié)構(gòu)碰撞

(6) The component collides at the node, and when supporting the upper chord, the supporting web member collides with the supporting structure

(7)承重節(jié)點(diǎn)位移

(7) Displacement of load-bearing nodes

(8)格柵撓度過大,超過設(shè)計(jì)規(guī)定的相應(yīng)設(shè)計(jì)值的1.15倍

(8) The deflection of the grid is too large, exceeding 1.15 times the corresponding design value specified in the design

二、門式剛架工程常見質(zhì)量事故

2、 Common quality accidents in portal frame engineering

(1)主要部件的變形和扭曲

(1) Deformation and distortion of main components

(2)預(yù)埋件不符合圖紙和規(guī)范要求,高差和間距超標(biāo)

(2) The embedded parts do not meet the requirements of the drawings and specifications, and the height difference and spacing exceed the standard

(3)鋼架整體垂直度和整體平面彎曲超差,梁柱端板孔位置不對應(yīng),尺寸錯位

(3) The overall verticality and overall plane bending of the steel frame are out of tolerance, and the positions of the end plate holes of the beams and columns do not correspond, resulting in dimensional misalignment

(4)主要受力節(jié)點(diǎn)焊縫不飽滿或有超過規(guī)定標(biāo)準(zhǔn)的氣泡、夾渣和微裂紋

(4) The main load-bearing nodes have incomplete welds or bubbles, slag inclusions, and microcracks that exceed the specified standards

(5)輔助穩(wěn)定結(jié)構(gòu),如支架、系桿、膝撐等。處于不合理的位置或處理不正確

(5) Assist in stabilizing structures such as brackets, tie rods, knee braces, etc. Being in an unreasonable position or mishandling

(6)二次元件不符合質(zhì)量要求

(6) The secondary element does not meet the quality requirements