行業(yè)動(dòng)態(tài)
dongnews
企業(yè)案例
case
聯(lián)系我們
- 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
- 手機(jī):15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場3區(qū)317
保證鐵藝大門質(zhì)量的話就要求各方面做好
來源:http://nsjsw.cn 日期:2022-06-28 發(fā)布人: 瀏覽次數(shù):24次
無論何種鐵藝大門形式,終要考慮的性能都是性。其次考慮鐵藝大門的性能質(zhì)量以及使用質(zhì)量,那么保證鐵藝大門質(zhì)量的話就要求各方面做好!
Regardless of the form of iron gate, the performance to be considered is safety. Secondly, considering the performance quality and use quality of the iron gate, it is required to do a good job in all aspects to ensure the quality of the iron gate!
施工前必須進(jìn)行技術(shù)交底,不違章作業(yè),服從人員的指揮。
Before construction, safety technical disclosure must be carried out, operation against rules shall not be carried out, and the command of safety personnel shall be obeyed.
愛護(hù)一切設(shè)施和用具,做到正確使用不隨便拆改。
Take good care of all safety facilities and appliances, use them correctly and do not dismantle or change them casually.
施工人員進(jìn)入現(xiàn)場要戴好帽、帶、焊接人員必須穿好絕緣鞋。
Construction personnel shall wear safety helmets and safety belts when entering the site, and welding personnel must wear insulating shoes.
焊接時(shí)要設(shè)有專人看護(hù),備好消防器材,焊接結(jié)束即刻查看現(xiàn)場,確定無隱患后,方可撤離現(xiàn)場。
A specially assigned person shall be assigned to take care of the welding, prepare fire-fighting equipment, inspect the site immediately after the welding, and evacuate the site only after it is confirmed that there is no hidden danger.
此外,在施工完成后,將施工現(xiàn)場的材料堆放整齊,對每天施工剩下的邊角料進(jìn)行整理、清掃,做到工完料凈場地清。對施工區(qū)域、危險(xiǎn)區(qū)域設(shè)立醒目的警示標(biāo)志,并采取保護(hù)措施。
In addition, after the construction is completed, the materials on the construction site shall be stacked neatly, and the leftover materials left in the daily construction shall be sorted and cleaned to ensure that the materials are clean after the completion of the work and the site is clean. Set up eye-catching warning signs in the construction area and dangerous areas, and take protective measures.
鐵藝大門材料要求:所有鐵藝大門材料及成品進(jìn)場,必須有材質(zhì)單,質(zhì)量 保證書。
Material requirements for iron gate: all iron gate materials and finished products must be provided with material list and quality guarantee.
施工人員上崗前,根據(jù)其不同工作崗位,進(jìn)行技術(shù)與文明施工的教育。
Before construction personnel take up their posts, they shall carry out education on technology, safety and civilized construction according to their different posts.
在鐵藝大門施工過程中由技術(shù)人員進(jìn)行檢查,及時(shí)糾正施工現(xiàn)場違章操作等問題。提出質(zhì)量整改單及質(zhì)量問題更改措施,保證工程質(zhì)量達(dá)到設(shè)計(jì)要求及驗(yàn)收規(guī)范。
During the construction of the iron gate, the technicians shall inspect it and correct the illegal operation on the construction site in time. Put forward the quality rectification sheet and quality problem change measures to ensure that the project quality meets the design requirements and acceptance specifications.
嚴(yán)格執(zhí)行工程質(zhì)量標(biāo)準(zhǔn),濟(jì)南鐵藝大門的品種、規(guī)格、型號(hào)、厚度必須符合工程和設(shè)計(jì)要求,焊口滿焊,打磨光滑平整。做到美觀,制作尺寸準(zhǔn) 確,產(chǎn)品做到橫平豎直,符合設(shè)計(jì)要求及驗(yàn)收標(biāo)準(zhǔn)。
Strictly implement the project quality standards. The variety, specification, model and thickness of Jinan Tieyi gate must meet the engineering and design requirements. The welded junction must be fully welded and polished smooth. The product shall be beautiful and accurate in size. The product shall be horizontal and vertical, meeting the design requirements and acceptance standards.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://nsjsw.cn并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://nsjsw.cn And consult our staff, will serve you wholeheartedly.