无码中文字幕va精品影院,国产久热香蕉在线观看,久久福利青草狠狠午夜,亚洲国产精品嫩草影院,小雪游泳池被教练猛烈进出,亚洲天堂网2018官网

銷售咨詢熱線
15953126901
18615254757
公司新聞 hengye
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
  • 手機(jī):15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317
當(dāng)前位置: 首頁(yè) > 新聞資訊>公司新聞輕型鋼結(jié)構(gòu)怎么減少用鋼量

輕型鋼結(jié)構(gòu)怎么減少用鋼量

來源:http://nsjsw.cn 日期:2018-12-20 發(fā)布人: 瀏覽次數(shù):50
不管是搭建廠房還是車間,大都會(huì)選用鋼結(jié)構(gòu)材料,在使用輕型鋼結(jié)構(gòu)施工時(shí),該怎么減少用鋼量呢?下面詳細(xì)了解下。
Whether building workshop or workshop, most of them choose steel structure materials. When using light steel structure, how to reduce the amount of steel used? The following details.
一、長(zhǎng)與寬的選擇
I. Choice of Length and Width
一般來說,在布置柱網(wǎng)時(shí)應(yīng)遵循長(zhǎng)度大于寬度的原則,能減輕輕型鋼結(jié)構(gòu)用鋼量,同時(shí)也能減少柱間支撐的風(fēng)荷載,從而降低支撐系統(tǒng)的用鋼量。
Generally speaking, the principle that length is larger than width should be followed in the arrangement of column network, which can reduce the steel consumption of light steel structure and the wind load of the support between columns, thus reducing the steel consumption of the support system.
二、柱距選擇
2. Pillar Spacing Selection
標(biāo)準(zhǔn)荷載作用下的經(jīng)濟(jì)柱是8-9m,超過9m時(shí),屋面檁條與墻架體系的用鋼量增加太多,綜合造價(jià)并不經(jīng)濟(jì)。
The economic column under standard load is 8-9m. When it exceeds 9m, the steel consumption of roof purlin and wall frame system increases too much, and the comprehensive cost is not economical.
三、合理跨度的確定
3. Determination of Reasonable Span
 
                               濟(jì)南輕型鋼結(jié)構(gòu)
 
不同的生產(chǎn)工藝流程,和使用功能在很大程度上決定著跨度,一般根據(jù)自己的使用功能,確定較為經(jīng)濟(jì)的跨度。在盡可能滿足生產(chǎn)工藝和使用功能上,應(yīng)根據(jù)房屋的高度確定合理的跨度。一般情況下,當(dāng)柱高、荷載一定時(shí),適當(dāng)加大跨度,剛架的用鋼量增加不太明顯,但節(jié)省空間,基礎(chǔ)造價(jià)低,綜合效益較為可觀。
Different production processes and use functions determine the span to a great extent. Generally, according to their own use functions, a more economical span is determined. In order to satisfy the production process and use function as far as possible, the reasonable span should be determined according to the height of the house. Generally speaking, when the column is high and the load is fixed, the steel consumption of the frame increases slightly when the span is increased appropriately, but the space is saved, the cost of the foundation is low, and the comprehensive benefit is considerable.